MCP tools
update_cost_split
Sets how much of a cost category is fixed and how much is variable.
update_cost_splitChanges your projectSet the fixed-vs-variable percentage for one or more cost categories (id + fixedPct, 0-100). Only the ids you pass are changed; every other category's split stays as it was.
| Parameter | Type | Notes |
|---|---|---|
| projectId | string | Required. |
| updates | object[] | Required. |